The railroad has been a dream for a long time, but it has expe-  and the Abreu e Lima Refinery (Rnest), with capacity increased by
                     rienced a troubled history, full of ups and downs. The project final-  the  installation  of the second  refinery  train -,  throughput  at the
                     ly got started in 2006 but was suspended one decade later. The   port should now soar and is expected to reach 48.6 million tonnes
                     original project was redesigned in such a way as to exclude the   in 2030.
                     branch line that would have benefited the industrial port. Every-   One study of the demand has indicated potential markets for
                     one in Pernambuco joined forces to ensure that this bad decision   the new transport system. It will be possible, for example, to trans-
                     was reversed. Business, politicians, and the State government all   port fruits grown in the São Francisco Valley region. The gypsum
                     got together to succeed in turning things round.       hub in Sertão do Araripe may well become another rail transport
                         The result is that, now in 2023, the Salgueiro-Suape branch   user, since it still transports all its goods long distances by truck.
                     line has been included in the Federal Government’s Accelerated    Another important market that could be attracted by the
                     Growth Program (PAC). Projected investment of R$ 5 billion will   railroad is that of the so-called MATOPIBA Polygon. This region -
                     require sound financial management. More exciting still are the   formed by the States of Maranhão, Tocantins, Piauí and Bahia – is
                     much broader horizons this has opened. This is typical of a struc-  a major producer of goods such as soya and corn. None of this
                     tural project of this size.                            produce currently comes through Suape. We fully expect, howev-
                        The initial projections are ready. With the railroad in operation   er, that this is soon set to change. Rail transport should speed up
                     – bearing in mind that Suape will now have a mineral ore terminal   economic development.